Platform Engine
Machine-run against the schedules, no human pass.
Drop your Bill of Quantities and TentBid reads it, matches every line against the PWD, LGED and RHD schedules, and carries it through to a priced bid. No manual typing. No formulas.
Every client sends a BOQ in a different format. Scans, screenshots, tables that break across pages. Someone has to retype it all.
Copying items into Excel. Looking up rates. Cross-checking quantities. It takes days — and you still have to submit on time.
A decimal in the wrong place. A missed line item. A rate from last year. Small errors quietly wipe out your margin.
Is this a PWD rate? What's today's price for MS rod or cement? The answers live in ten different files — or one senior's head.
Drop the tender document. Every line comes back priced against the schedule — and where there is a judgement to make, you make it.
| Item | Qty | ৳ Amount |
|---|---|---|
| Brick work | 420 m³ | 14,70,000 |
| RCC (MS rod) | 86 m³ | 62,28,000 |
| Plaster | 1,240 m² | 7,44,000 |
| Tile flooring | 680 m² | 13,60,000 |
| Paint | 1,960 m² | 3,52,800 |
| Total | 1,01,54,800 | |
Nothing is rounded, corrected or reinterpreted. What you submit reconciles with what the client published.
Each one shows how sure it is, so you know where to look and where not to.
Options arrive with prices attached. You decide on numbers instead of hunting through a rate book.
Height and location are accounted for, so a line isn't quietly under-priced and eating your margin at the final account.
Work no schedule covers still gets a full costing — you're never stuck at 11pm before submission.
Half-finished work waits for you, on any machine, for as long as you need.
A tender can carry several priced rulings side by side. Compare them, open the one you trust, and start from a finished bill instead of a blank one.
Machine-run against the schedules, no human pass.
Priced and checked by our own estimators.
Produced by an independent consultancy on the platform.
Priced by the item, at the same rate as estimating it yourself — so the choice is time, not money. What you unlock becomes your own copy to adjust; the original never changes.
What the work costs you, and how you choose to get paid for it. The estimator keeps them apart on purpose — they answer different questions.
| Item | Dept rate | Your cost | Margin | Risk | Bid rate |
|---|---|---|---|---|---|
| Roadway excavation | 144 | 124 | +12% | 162 | |
| Embankment fill | 397 | 332 | +15% | 446 | |
| Aggregate base | 8,273 | 7,180 | +9% | 8,690 | |
| Reinforcement bar | 90,557 | 78,400 | +11% | 95,100 | |
| Bituminous surfacing | 22,133 | 19,850 | +7% | 23,240 |
Cost is a range, not a figure — and winning is a separate question from making money. Both are answered before the envelope closes, not after.
PWD, LGED and RHD in one place — with what sits behind each rate, not just the number. Free, whether you're bidding or not.
Price, minimum order, how fast and how recent — for the materials, labour and plant your own bill calls for.
Nothing lost when someone leaves or a laptop dies.
Not a generic estimating tool with a currency setting. The deductions, securities and schedules you actually work to are already in it.
Every item published by PWD, LGED and RHD — searchable, with the build-up behind each rate.
The same work priced three ways, so you can see which authority's rate you are bidding against.
Every line accounted for — matched, costed by AI, or priced by you. Nothing silently left out.
What you submit reconciles with what the client published. Nothing rounded or corrected behind your back.
Start free. Only pay for what you use. Buy credits when you need them — they never expire.
Enough to estimate your first big project end-to-end — auto-match PDF rows, run cost build-ups, and export BOQ & MOQ. No card required to start. Offer ends soon.
Search PWD, RHD, and LGED rates instantly. Browse full ingredient breakdowns, regional rates, and SoR records.
Upload a BOQ PDF, auto-match every row, edit unit prices, export BOQ & MOQ. Pay per item, not per project.
The same finished estimate as BOQ Estimation — already prepared by the platform engine, our in-house team, or a partner firm. Compare the rulings on a tender and unlock the one you trust.
1 credit = 1 item. ৳10 each, ৳4 during launch. No subscription. No expiry. Top up whenever you need more.
500 free credits on signup. No credit card, no setup call — just your PDF, priced against the schedule, ready to bid.
Headquartered in Dhaka. Serving construction teams across Bangladesh.