Built for LGED, PWD & RHD government tenders

From BOQ PDF
to a winning bid.

Drop your Bill of Quantities and TentBid reads it, matches every line against the PWD, LGED and RHD schedules, and carries it through to a priced bid. No manual typing. No formulas.

15,594priced items, ready to match
500free credits on signup
৳0setup cost to try it
boq-gulshan-tower.pdf
1 — Messy BOQ PDF
READING
MATCHING RATES
CALCULATING
2 — Auto-read & matched
estimate-gulshan-tower.xlsx
Item
Qty
৳ Amount
Brick work
420 m³
14,70,000
RCC (MS rod)
86 m³
62,28,000
Plaster
1,240 m²
7,44,000
Tile flooring
680 m²
13,60,000
Paint
1,960 m²
3,52,800
Total
1,01,54,800
3 — Clean Excel estimate

Estimation shouldn't eat your whole week.

01

Messy PDFs nobody can read.

Every client sends a BOQ in a different format. Scans, screenshots, tables that break across pages. Someone has to retype it all.

02

Hours of manual work.

Copying items into Excel. Looking up rates. Cross-checking quantities. It takes days — and you still have to submit on time.

03

One small mistake, big problem.

A decimal in the wrong place. A missed line item. A rate from last year. Small errors quietly wipe out your margin.

04

Hunting for the right rates.

Is this a PWD rate? What's today's price for MS rod or cement? The answers live in ten different files — or one senior's head.

A week of typing becomes an afternoon.

Drop the tender document. Every line comes back priced against the schedule — and where there is a judgement to make, you make it.

boq-gulshan-tower.pdf
1 Messy BOQ PDF
✓Reading
✓Matching rates
✓Calculating
2 Auto-read & matched
estimate-gulshan-tower.xlsx
ItemQty৳ Amount
Brick work420 m³14,70,000
RCC (MS rod)86 m³62,28,000
Plaster1,240 m²7,44,000
Tile flooring680 m²13,60,000
Paint1,960 m²3,52,800
Total1,01,54,800
3 Clean Excel estimate

Your quantities, untouched.

Nothing is rounded, corrected or reinterpreted. What you submit reconciles with what the client published.

Most lines price themselves.

Each one shows how sure it is, so you know where to look and where not to.

When it isn't certain, it says so.

Options arrive with prices attached. You decide on numbers instead of hunting through a rate book.

Rates correct for the job.

Height and location are accounted for, so a line isn't quietly under-priced and eating your margin at the final account.

Nothing blocks you.

Work no schedule covers still gets a full costing — you're never stuck at 11pm before submission.

Close it and come back.

Half-finished work waits for you, on any machine, for as long as you need.

Someone may already have priced this tender.

A tender can carry several priced rulings side by side. Compare them, open the one you trust, and start from a finished bill instead of a blank one.

AI-Generated

Platform Engine

Machine-run against the schedules, no human pass.

750 crUnlock full analysis
In-House Team

Blue Team

Priced and checked by our own estimators.

3,000 crUnlock full analysis
Partner Firm

Padma Consultants Ltd.

Produced by an independent consultancy on the platform.

4,250 crUnlock full analysis

Priced by the item, at the same rate as estimating it yourself — so the choice is time, not money. What you unlock becomes your own copy to adjust; the original never changes.

Two ways to arrive at a number.

What the work costs you, and how you choose to get paid for it. The estimator keeps them apart on purpose — they answer different questions.

Analysiswhat it costs you
  • Build each rate from what you will actually pay for materials, labour and plant
  • Your cost sits beside the department's on every line, so the gap is never hidden
  • One material schedule across the whole project
Strategyhow you get paid
  • Weight the bill toward work you do early, so cash arrives sooner
  • Mark items early, mid or late — escalation exposure follows the timing
  • See the few items carrying 80% of the project's value, and protect those first
  • Measure your own quantities without changing what you are paid on
Bid price consoleStrategyAnalysisRisk
ItemDept rateYour costMarginRiskBid rate
Roadway excavation144124+12%162
Embankment fill397332+15%446
Aggregate base8,2737,180+9%8,690
Reinforcement bar90,55778,400+11%95,100
Bituminous surfacing22,13319,850+7%23,240
Every line with its cost, its margin, and what it would take to win.
100%SOR match before you price a single line

Test the number before you submit it.

Cost is a range, not a figure — and winning is a separate question from making money. Both are answered before the envelope closes, not after.

Riskhow likely it holds
  • See the spread of what the work could cost, not a single figure
  • The chance this price makes money, stated plainly
  • Which items drive the uncertainty, ranked — so you know where to sharpen
Competitionwhat it takes to win
  • Model rival bids and see where a competitive price sits
  • Weigh your number against a likely floor before you commit
  • Watch win probability and margin move together as you adjust
Project cost distribution
P20৳10.74 Cr
P50৳10.99 Cr
P80৳11.25 Cr
Chance this price makes money78%
Top variance contributors
Aggregate base30%
Embankment fill30%
Reinforcement bar18%
Bituminous surfacing12%
P20P50P80৳10.7 Cr৳11.3 CrWhere your price sits against cost — and how much room is left.Win chanceHigher priceWin chance falls as price rises. Where you sit on it is the decision.

And the things you shouldn't have to keep chasing.

Every schedule, always current.

PWD, LGED and RHD in one place — with what sits behind each rate, not just the number. Free, whether you're bidding or not.

Find who sells it.

Price, minimum order, how fast and how recent — for the materials, labour and plant your own bill calls for.

Every tender you've bid, kept.

Nothing lost when someone leaves or a laptop dies.

9,627
PWD
Schedule of Rates
5,719
LGED
Item, Minor & Sub-minor
248
RHD
Schedule of Rates
15,594
Total
priced items, searchable

It already knows how tenders work in Bangladesh.

Not a generic estimating tool with a currency setting. The deductions, securities and schedules you actually work to are already in it.

VATAITRetentionAdvancePerformance securityBid securityEscalationFinancing costDefect liability periode-GP procurement methodPWD / LGED / RHD schedulesRegion & rate year
15,594

Priced items, ready.

Every item published by PWD, LGED and RHD — searchable, with the build-up behind each rate.

3schedules

Compared side by side.

The same work priced three ways, so you can see which authority's rate you are bidding against.

100%

Matched before you price.

Every line accounted for — matched, costed by AI, or priced by you. Nothing silently left out.

0rewrites

Your quantities, untouched.

What you submit reconciles with what the client published. Nothing rounded or corrected behind your back.

Built for government tenders
LGED
PWD
RHD

Things people ask us first.

Do I need to format my BOQ in a specific way? +
No. Upload the PDF exactly as you received it — any layout, any length. It is read as it is, and your quantities are never altered.
How accurate are the rates? +
They come from the published PWD, LGED and RHD schedules — 15,594 items — priced for your region. Every rate is shown before you finalise, with the materials and labour behind it, and you can change any of them.
What happens to lines no schedule covers? +
You still get a full costing for them, broken down the same way, and you can price them yourself instead. Nothing is left blank and nothing silently drops out of the total.
What does it cost? +
Searching rates is free, forever, with no upload. Estimating is one credit per BOQ item — you get 500 credits free on signup, and top up only when you need to. No subscription, no expiry.
Can I use an estimate someone has already priced? +
Yes. Tenders already priced on the platform can be opened instead of started from scratch. You see the likely cost and its spread before you unlock, and what you unlock becomes your own copy to adjust.
Can my whole team use it? +
Everyone can have an account, and the same tender can be priced by more than one of them — each keeps their own version, so nobody overwrites anyone. Shared team projects are on the way.
What if I have to stop halfway? +
Your work saves as you go. Close the tab, change machine, come back next week — the tender is in My Projects exactly as you left it.
Is my data safe? +
Your account's work is private to you, and you can delete any project permanently whenever you want.
How do I get started? +
Create an account with your mobile number, upload your first BOQ, and you will have a priced bill before your tea gets cold.

Simple, credit-based pricing.

Start free. Only pay for what you use. Buy credits when you need them — they never expire.

Limited-time launch offer

৳4 per item৳10 — 60% off, plus 500 free credits on signup.

Enough to estimate your first big project end-to-end — auto-match PDF rows, run cost build-ups, and export BOQ & MOQ. No card required to start. Offer ends soon.

Claim 500 creditsNo credit card · Sign up in 60 seconds
Free forever

Unit Rate Search

Search PWD, RHD, and LGED rates instantly. Browse full ingredient breakdowns, regional rates, and SoR records.

৳0/forever
  • ✓ PWD, RHD & LGED rate lookup
  • ✓ Full ingredient breakdowns
  • ✓ Regional rate comparison
  • ✓ Unlimited searches
Get started free
Ready-made

Analyses

The same finished estimate as BOQ Estimation — already prepared by the platform engine, our in-house team, or a partner firm. Compare the rulings on a tender and unlock the one you trust.

৳4/item unlocked
৳10 · 60% off during launch · total varies by the BOQ behind it
  • ✓ Every row already matched & priced
  • ✓ Editable unit prices
  • ✓ VAT, overhead & profit build-up
  • ✓ CSV export (BOQ + MOQ)
  • ✓ Prepared by AI, in-house or partner team
Browse analyses

1 credit = 1 item. ৳10 each, ৳4 during launch. No subscription. No expiry. Top up whenever you need more.

Price your next tender.
Your first BOQ is free.

500 free credits on signup. No credit card, no setup call — just your PDF, priced against the schedule, ready to bid.

Let's talk about your construction workflow.

Contact information

Headquartered in Dhaka. Serving construction teams across Bangladesh.

Office

Level 2, Road #21/A, House #05
Nikunjo-02, Dhaka 1229

View on Google Maps →

Send us a message